HBF Arena Joondalup

HBF Arena Joondalup for Distinctive Pools

This project involved the refurbishment of the large leisure pool and the 25m learn to swim pool. The floor preparation process included scabbling, grinding, priming and screeding. The leisure pool, lazy river pool and lane markings were all retiled. The gutters and balance thanks were waterproofed and Combiflex jointing was applied to all pools.