Mineral Resources 20 Walters Drive
Mineral Resources 20 Walters Drive, Osborne Park
Kwikcut was engaged by MRL to complete more than 1100m2 of concrete removal over 12 x levels of their new office building in Osborne Park.
Details:
- We commenced work on-site, installing crash decks over multiple levels to allow the safe removal of 300mm – 400mm thick concrete slabs.
- All the concrete removal was strategically planned, utilising both day and night shifts to ensure the prompt completion of the project.
- The penetrations varied in size from 6m2 up to 90m2 and were removed via gantry crane after the sawing and core drilling works had been completed.
Highlights:
- Running day shift and night shift prior to 16th January deadline
- The use of carbon fibre strips reinforce areas of the slab weekend by penetrations.
- Safe removal of 1100m2 of concrete across 12 levels.
- Concrete remediation applied to exposed concrete and steel from penetrations.